Year Built
2018
Location
Blackfalds, AB
Duration of Project
3 Months
In spring of 2018, Rus-Tec Engineering and Care Industries worked together in performing an API Level IV structural inspection on CWC Rig 206’s mast and carrier. The customer also requested a series of structural and design upgrades to the existing equipment. On the mast, these upgrades included replacing the latch box system and upgrading scoping cylinder and mounts, racking board and rod board. On the carrier, the design weight & balance was analyzed and a third axle was added into the front axle group based on the calculations for this rig to achieve a period 1 transportation classification. Rus-Tec Engineering also performed a global analysis of the complete rig to re-rate and re-certify the maximum static hook load, wind capacity, and guy-line requirements. A complete 3D model and set of fabrication drawings was created for this rig. Rig 206 received an executive overhaul, with quality upgrades, new certification plates, new paint, and returned back to the customer ready to go to work.
Back to All Projects