Project Overview
The Medusa Flare Knockout Tank
Year Built
2024
Location
The Woodlands, Texas
What our client saw was approximately 3500ft of iron missing, 250+ less unions with pups & swings, minimal TPR, and 12+ less hours of manpower to rig up the job.
Our Medusa Flare Knockout Tank increases safety amongst personnel while decreasing the number of ground hazards on location. 16 inlets resulting in one 10” flare line and one 4” PSV line to flare.
- Less iron, shorter rig ups, eliminate TPR, greatly reduce risk of injury
- Eliminate chance of carryover to flare
- Fewer connections means increased safety during sour gas operations
- High-pressure header with ANSI 900 valves in place to divert flow
Back to All Projects